![]() |
Quote:
|
You need to read mister..
Read it again.. You need that power per minute per square meter, all three things are variable.. with 5A it would take 1000 minutes for a 1/2 square meter to be anodized. Get it...? |
i was wondering the same exact thing. that makes much more sense.
|
Doh! :dft001:
The current value was so high that everything else was ignored. Bad Brian! |
Lol!
apparently, the number freaked you out.. |
| All times are GMT -4. The time now is 12:31 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.