![]() |
That looks F*ckin awesome James!!!!
|
Let me know when it's done so we can head out to do some action video of it. Excellent work as always!
|
Wow, thats astounding- very nice! now get it running and take vid...
:lol: |
The motor mount looks sick! I was wondering how you were going to do it. It looks just like the Tekno stuff, which is a great way of mounting the motor. I would say to make sure the chassis doesn't flex so the gear mesh remains the same.
Looks great!! |
wow its really coming together
|
Quote:
|
Looks beautiful man..!
|
Awesome....When do you think it'll be up and running?
|
Beautiful, simply beautiful. :smile:
I am anxious to see this thing running, and on some jumps too! |
My pinion came with out a set screw also. I will have to call them tomorrow.
|
Quote:
|
This sucks. They changed their web site. The hub & set screw option isn't offered now. I hope they changed it in the last day or so since you contacted them.
How deep of a hole did you have machined out of the gear? I think it needs to be 4mm deep to have enough of the shaft sticking out the other side to fit on the bearing. I'm going to a machine shop this morning. What size set screw did you use in the pinion? |
I think we are going to be SOL...
Her reply to my email was that the website "had" and error and has since been corrected. |
Quote:
as for the pinion i used a 6mm set screw. if your machinist is like mine and doesnt have metric stuff tell him to drill a 3/16" hole in the pinion for a set screw and then the 6mm tap works perfect. i have been using this guide for my own tapping and drilling. your machinist will have the same type of chart. http://www.imperialinc.com/pdf/I_Tap&DieChart.pdf |
Quote:
|
| All times are GMT -4. The time now is 01:05 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.