|
06.11.2007, 09:35 PM
Received all my stuff today, so I am starting to install everything into the buggy. Just to verify that this is correct, all I have to do to install the UBEC is the solder the end leads with the leads of the MM into the deans plugs... is this correct? Then I just turn off the internal BEC from the MM via computer. Is this right?
I have heard you have to clip some red wire... there are two red wires that I see; 1 for the deans plug and the other to plug into the receiver. If I do have to cut a wire, how far down the wire should you cut it. I just want to get everything right form the start.
Thanks
|