View Single Post
Old
  (#13)
johnrobholmes
RC-Monster Aluminum
 
johnrobholmes's Avatar
 
Offline
Posts: 905
Join Date: Aug 2007
03.11.2008, 06:15 PM

I talked to Pat about paralleling them for a while, and he said it would work but not effectively enough for 2x the power. Some bit about matching components and how one BEC may put out .01v more and take more load than the other. He did say it would work well as a back up system though, and that it would probably give about 125% of one BECs rated power.

Good test there. Got a way to watch the voltage under fast changing input voltage and changing load?
   
Reply With Quote