Quote:
Originally Posted by Pdelcast
Yeah, we started with the BSC082N10 about a year ago on the SHV design. Found it had the same issues (even worse actually) as the BSC079
But that's OK, the BSC118N10 works fine, and handles almost as much current as the other two.
Now, a 12S controller only needs a 60V FET, not 100V.
One possibility is that I'm working on the 60V (12s) Phoenix-ICE controller line right now, and it will have the hardware support for Mamba type software (the current Phoenix-HV does not have similar hardware to the Mamba line.)
Patrick
|
Ok. The Phoenix-ICE sounds good. Will the SHV support the Mamba software as well. I just heard that my F1 will be in the next shipment to the US and I will use my 2 10S1P A123 and my 2 10S1P Bosch packs with it and I would like to use them for this F1.
Edit: I only mentioned the 100V mainly because I haven't seen a 60V in that package.