|
03.30.2009, 10:17 PM
IDK the "proper" way, but I would put a 2x4 on ea side and put long screws or bolts thru, preferably bolts and washers. I tend to over engineer things, so maybe it could be less, but why go halfway?
Last edited by Finnster; 03.30.2009 at 10:24 PM.
|