View Single Post
Old
  (#5)
PDM
RC-Monster Stock
 
Offline
Posts: 15
Join Date: Mar 2009
05.11.2009, 06:24 AM

The 20 minutes I made with a 6000mah pack without swap packs. For that the race director made me do 2 stop and go, at the minute 7 and the minute 14, at the box to simulate the nitro pits.

The 45 min Final I made with 2 swaps. At minute 15 and minute 30. Packs of 5000mah.
   
Reply With Quote