|
10.15.2010, 02:50 PM
Give me a 2s pack and I'll see what it really can do. I would start off with cycling the pack at 40A at around 10x with the WhatAnut Charger. NO cooldown period. Then a 30 second burnout while watching the voltage under load.
6 KiloWatt A123 Racer
GTP-Pletty Big Maxximum+RX8. GTP-C50-6L Hacker+RX8. CRT.5-Pro4+ZTW esc.
24s2p EVG SX 49.6mph Ebike.
18s4p Raptor 60mph Ebike. 11.5KW
|