Quote:
Originally Posted by Jahay
That is huge!!!!
I can see now how much you had to file of the bulks to get the arms to FIT!!! quite a bit!!! but should be fine anyway...
keep me posted! :)
|
In all, I removed about 6g worth of material per bulk half. Fortunately most of the work was done by my drill press. I basically ran a bit just larger than the arms right down the hinge pin hole to open it up. It only took me a few minutes to do the entire set. Most of the work came after removing a few bits here and there to get the right fit and clean the bulks a bit. I have one more set I have to do the finishing work on. I'll get a pic soon to show.
Also sat and played with the front str rack and servo placement a bit doing some brainstorming. Had an idea where I could move the motor up farther, move the servo from where its shown, and have enough room in back where I might just have enough room for a rear str setup.
I think I'll go ahead with the fixed rear for now, but leave room for a rear str setup I can swap in later. The front and rear arms are interchangeable, so just an arm and hub swap and a couple other bits would be needed to change the rear over for 4ws. I might be able to work it out so its a quick swap. We'll see.