|
09.07.2008, 07:40 PM
It'd cost a lot more than $30 at this point because of all the tooling/molds/time/money CC has invested into the current MMM. And I'm sure CC had certain goals such as price, power, voltage, etc. for the MMM which they wanted to stick to.
SH Z-Car, Custom Crawler, 8s Savage, 12s XTM XLB 1/7 buggy, 4wd 4-link rear/IFS Pro4 truck, Custom Hyper 10 Short Course, Belt-Drive Mammoth ST 1/8 truggy, 4s 17.5 MM Pro HPI Blitz
|