First phase. - 04.18.2011, 11:46 AM

The second part of the project was removing the old power panel and installing a new one. The ground wires from the original panel were never even grounded. They were all twisted together and left hanging inside the wall. Nice huh?













Once this was completed I was able to get power back up and hook up the hot water heater and digital timer so that I was able to take hot showers and do my laundry. Of course I had to finish up building the new laundry room and get the washer & dryer set installed.



SO I had to remove the old gas hot water heater from insdie this closet and re-route the piping into the garage where I mounted the new energy efficiant electirc hot water heater. I used slip fittings for the first time and man those fittings are great. Easy to install, no soldering, and no leaks either.







SUPERMAXX YOUR LIFE.
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com