RC-Monster Forums  

Go Back   RC-Monster Forums > Support Forums > Unlimited Engineering

 
 
Thread Tools Rating: Thread Rating: 3 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
Old
  (#10)
MiRatlhed
RCMTC-MI
 
MiRatlhed's Avatar
 
Offline
Posts: 198
Join Date: Apr 2009
Location: Vermontville, Mi
10.23.2011, 06:57 PM

I started on getting my Lightning built up now that I got all my little black pieces back from the anodizing shop I sent them to. I have been working on it all weekend and got a lot done. Going to work on the shocks and suspension this week.

Building up the diffs :



Shimming was not too bad at all, once I got the rear all completed and assembled it was not good so I had to take that one back apart and remove a shim from the pinion shaft. Then it smoothed it right out.



All done and skids on:



Had to mess with the G1 transmission a bunch. I don't know if it was the anodizing that added the tolerance to the bearing seat on the one side of the case or what but every time I would bolt it together it would bind up and not roll freely. I replaced all the bearings and had to grind the input gear a bit to free it up. Took forever to get it done right but I finally got it. Mounted the F/R up and the transmission.





More coming this week.


   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com