RC-Monster Forums  

Go Back   RC-Monster Forums > Support Forums > General Electric

 
 
Thread Tools Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
Old
  (#13)
johnrobholmes
RC-Monster Aluminum
 
johnrobholmes's Avatar
 
Offline
Posts: 905
Join Date: Aug 2007
03.11.2008, 06:15 PM

I talked to Pat about paralleling them for a while, and he said it would work but not effectively enough for 2x the power. Some bit about matching components and how one BEC may put out .01v more and take more load than the other. He did say it would work well as a back up system though, and that it would probably give about 125% of one BECs rated power.

Good test there. Got a way to watch the voltage under fast changing input voltage and changing load?
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com