RC-Monster Forums  

Go Back   RC-Monster Forums > RC-Monster Area > General Discussion

Reply
 
Thread Tools Rate Thread Display Modes
Old
  (#1)
BrianG
RC-Monster Admin
 
BrianG's Avatar
 
Offline
Posts: 14,609
Join Date: Nov 2005
Location: Des Moines, IA
12.31.2008, 01:01 AM

Well, if the battery is too hot, just gear down.

Seriously, no matter what, drilling fairly large holes into wood is gonna take some power. Even though the adverts say "heavy duty" or whatever, they apparently are not truly made for that application. Gotta figure the power requirements too. A corded drill that pulls say, 5A @ 120V AC is 600w. To get that same power out of 18v, you need 33.3A. A 2.5Ah pack will only last 4.5 minutes. Reduce that runtime further by the higher loads. Not to mention you need a continuous C rating of 13.32, and that's assuming a 5A draw - it could be higher.

Just like BL, HV is king for high power, which is why 120V excels.
  Send a message via Yahoo to BrianG Send a message via MSN to BrianG  
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com