Each system requires new tooling for 2 multi-layer PCBs, case, water-"resistant" seal, heatsinks, packaging, instructions, art work, advertising The software usually needs to be updated with each new release to add new features---lipo cut-off circuitry, motor rotation, etc. etc.---so each system project starts from almost ground zero.

Then a number of prototypes need to be designed and mostly hand built. Then the beta units have to be tested. Most of the other sub projects don't begin until the board design is locked-in. Then all the parts for the project can be ordered---some with 8-12 week lead times. Novak has 4 engineers---5 really, but 1 is the Operations Manager.

Quote:
Originally Posted by lutach View Post
R&D is a killer when you're designing something completely different. They already have the MPU software OK. I know this beacuse Videoton of Hungary sent me quotes for a prototype product and they changed the quote 8 times before they had it right, but this was for a new product. Now for products they already make, they might change for something compatible and that is it. I would like to see a system that could also run the sensored Aveox. Does Novak have their own engineers?


Novak Electronics, Inc.
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com