Patrick, thanks for posting, let me cut through all the technical mumbo-jumbo. I want to buy a MMM but I need it in the next two weeks, should I just buy a MM or is the fabled "Second (coming) Batch" going to be shipping soon?
The second batch is coming soon -- we are finalizing a circuit change on the "brain" board. Production will resume about 1 week after changes are finalized.
Patrick del Castillo
President, Principle Engineer
Castle Creations