RC-Monster Forums  

Go Back   RC-Monster Forums > Support Forums > General Electric

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old
  (#14)
MetalMan
RC-Monster Mod
 
MetalMan's Avatar
 
Offline
Posts: 5,297
Join Date: Mar 2005
Location: SoCal
01.10.2007, 11:36 PM

After more than a month, I now have two separate packs using A123 cells. The first I built is a 3s2p and a 2s2p in series (5s2p). This pack was made using a technique I developed. The basis for this technique is soldering the cells side by side, but then putting them into a stick configuration. Basically, it's 5 groups of 2 cells in parallel. And with this method, I was able to keep the vents open, in the case that the cells need to vent. The copper braid I used to connect the cells together is soldered onto the metal tabs that came welded onto the cells.

Just yesterday I finished my two 2s2p brick packs. These are squares, 2 x 2. I soldered them together the same way as with the first packs, but didn't put them into a stick form.

I'll try to get some pics soon. Unfortunately I didn't document the buildup on the stick packs, so you won't be able to see how they were assembled.


SH Z-Car, Custom Crawler, 8s Savage, 12s XTM XLB 1/7 buggy, 4wd 4-link rear/IFS Pro4 truck, Custom Hyper 10 Short Course, Belt-Drive Mammoth ST 1/8 truggy, 4s 17.5 MM Pro HPI Blitz
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com